Sign In | Join Free | My burrillandco.com
Home > Meter Testing Accessory >

Single Phase Phantom Load

    Buy cheap Single Phase Phantom Load from wholesalers
     
    Buy cheap Single Phase Phantom Load from wholesalers
    • Buy cheap Single Phase Phantom Load from wholesalers
    • Buy cheap Single Phase Phantom Load from wholesalers
    • Buy cheap Single Phase Phantom Load from wholesalers
    • Buy cheap Single Phase Phantom Load from wholesalers

    Single Phase Phantom Load

    Ask Lasest Price
    Brand Name : GENY
    Model Number : Single Phase Phantom Load
    Certification : ISO, CE
    Price : negotiate rates
    Payment Terms : L/C,D/P
    Supply Ability : 100 pcs/ 1 months
    Delivery Time : 1~4weeks
    • Product Details
    • Company Profile

    Single Phase Phantom Load

    Single Phase Phantom Load
    Wiring Diagram

    Single Phase Phantom Load

    Notice: Although the positions of the L(in), L(out), N(in), and N(out) terminals may vary across electricity meters, the wiring principle remains common:

    • The line terminal (L) of the single phase phantom load → Connects to L(in) of the electricity meter.
    • The neutral terminal (N) of the single phase phantom load → Connects to N(in) of the electricity meter.
    • The current 20A/10A terminal of the single phase phantom load → Connects to L(out) of the electricity meter.
    Instructions
    1. When the user load is too low or zero to meet the calibration requirements of the electricity meter, connect the phantom load according to the diagram.
    2. For zero user load: After connecting the phantom load, the Current Clamp must clamp ONLY the current cable of phantom load during error testing.
    3. For low user load: After connecting the load, the clamp must simultaneously clamp both the current cable of phantom load and the original current cable connected to the electricity meter’s L(out) terminals. Otherwise, there is a additional measurement errors will be introduced.
    Precautions
    1. Do not reverse-connect current output and neutral wires.
    2. Never apply 380V between line and neutral wires.
    3. Turn off the switch of the phantom load before on-site wiring.
    Quality Single Phase Phantom Load for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Guangzhou GENY Electric Co., Ltd
    *Subject:
    *Message:
    Characters Remaining: (0/3000)